burnable poison assembly
常见例句
- Early studies analyzed using the WIMSSN system had large errors in fuel assembly analyses with burnable poison (BP).
用WIMS- SN系统计算含可燃毒物组件时,出现比较大的误差,不适宜低温供热堆含可燃毒物组件的计算。 - This paper introduces the improved NHR 10 core design which includes the arrangement of the gadolinium burnable poison (BP), the fuel assembly arrangement and the fuel assembly reloading scheme.
介绍了NHR- 10组件内钆可燃毒物配置、堆芯燃料组件布置和换料方案的改进设计。 返回 burnable poison assembly