pile after driving
常见例句
- The problem of the soil consolidation after tube-pile driving was studied.
研究了黏弹性土中管桩沉桩后的固结问题。 - After the interval stop the driving continues and that is called pile restart.
将停锤后继续进行打桩施工称为后继打桩。 - Here the function mechanism and the technology process of grouting after pile driving technology are explained by engineering examples and the development prospect is pointed out.
本文通过工程实例阐述了桩底注浆的工作原理和工艺流程,指出了桩底注浆技术的发展前景。 返回 pile after driving